The Project

A first-time developer acquired a large Victorian end-of-terrace house in Penge with planning permission to convert it into 4 self-contained apartments. The project was the developer's first scheme, and they needed a lender willing to work with a first-time developer while providing sufficient leverage to make the project viable.

!

The Challenge

As a first-time developer, the client faced limited lender options and typically higher rates. The Victorian building also required structural works to achieve the approved layout, including a rear extension, adding complexity and cost. The developer needed close to 70% LTC to maintain sufficient working capital alongside their deposit.

Our Solution

We identified a lender from our panel that specialises in supporting first-time developers and was comfortable with the structural nature of the conversion. The facility was structured at 70% LTC with staged drawdowns aligned to the build programme. We also connected the developer with an experienced project manager to oversee the build, which strengthened the lender's confidence. The rate of 0.85% per month reflected the first-time developer profile while remaining commercially viable for the project.

The Outcome

The conversion was completed one month ahead of schedule, delivering 4 apartments that exceeded the projected GDV. Two units were sold and two retained for rental, providing the developer with both a capital return and ongoing income. The successful project gave the developer the track record to secure more competitive terms for their next scheme.

Project Metrics

A full breakdown of the key financial metrics for this project.

MetricValue
Purchase Price£425,000
Build Costs£545,000
Total Facility£680,000
LTC Achieved70%
Rate0.85% pm
GDV Achieved£1,350,000
Developer Profit£195,000
Timeline8 months (1 month early)